| Detailed
Project Description |
To transfer 150mu idle land of sand and
stone ground of Guizhou Automobile Refit Company after negotiation,
then to construct multi-floor factory buildings park with
a total building area of 100000m2. |
| Abstracts Of Market Analysis, Construction Condition
& Background |
I. Necessity:
Guiyang Development Zone is the national-level
Economic & Technical Development Zone and one of central
districts of Guiyang. It has convenient transportation and
communication. Its near to the railway station, freight station
and airport with obvious advantage of location. It has strong
industrial basis with good abilities of research and development
and supporting in the field of machinery and electron which
having introduced a lot of medium and small investors to build
factories here. With the fast development of the zone, contradictions
of short of small land, hard to take over for use land and
long periodic time for taking over use land have turned up.
So it is very necessary to build a standard factory buildings park to satisfy the demand
of economy’ fast growth.
II. Construction condition
The land is very flat with Tongyin Road
across. Water, electricity and gas is sufficient. |